Today we preapared the next big chapter of remodeling the house. Anna's rooms will be done one after another.
OK, we already renovated her two bedrooms and her study she will use before completely move into her part of the house, so the headline isn't quite right.
For my readers who aren't familiar with the renovating progress:

Green are the rooms that are already done. These are - at least in the first story - also the rooms for me, but until Anna will be done with her study she is going to live also there and will move later into her part of the house. At the moment she still enjoys me making the household, cooking, cleaning and whatever there has to be done day by day.

In the second story the green rooms are also done. A thick red line means that these rooms are belonging to Anna's apartment. A thick yellow line means that these rooms are used by both of us like the guest room, the laundry and the barn, which will later be a library and living room.
Red is Anna's hallway, because this is the room which is currently remodeled. Later this month the laundry will follow, which therefore is pink.
Blue are the rooms where we are currently living.
Today we tidied up a lot and moved a lot of furniture, so Anna's hallway (the red room in the maps) is prepared for painting it next weekend:

Anna decided that she wanted to have the desk of her grandmother. Here it is. It's from the 60ies and the wood is birchtree. The front door of her hallway will get a light and friendly color, not that dark brown. Later also the floor will change: sand beige floor tiles like everywhere inthe house. But with this floor project we still have to wait, because we need the money for more urgent things at the moment. In the center of the picture you see the stairs which are leading upstairs to Anna's kitchen and living room.

Another view with a new dresser made of birch wood like the desk.

This little cabinet will be painted in light cream. Anna wanted to have it, because there is a very stylish music stereo equipment in it which allows to play old vinyls. The doors are currently removed for painting them.

Um... the staircase is very wooden. But here we can't reomove the entire wood without destroying too much. So the wood has to stay. With a lot of pictures, stylish and bright lamps and decoration it will do. We can't remove the wood everywhere. It's also in Anna's kitchen and in her upper hallway, but there we are going to paint it. Here we can't paint it, because I am not able to work 5 meters above the ground on a shaky ladder which is placed on the steps. I would die of fear!
So be curious about what will happen to the room the next weeks and how we solve the problems.
By the end of May the next big project is waiting, the laundry. This is how it looks like after we tidied the room up this morning:


It's a LOT of work!
The color will be light cream and orange in the laundry. I looked for some fabric for sewing curtains, cushions and so on and found this so far:

The pattern should be something with small flowers and something that fit's to a country house. My favorite is the American fabric No 3. But maybe there is a better choice? What do you think?
Recent Comments